In petroleum production, completion is the process of making a well ready for production (or injection). This principally involves preparing the bottom of the hole to the required specifications, running in the production tubing and its associated jewellery and perforating and stimulating as required. Sometimes, the process of running in and cementing the casing is also included.

Lower completion

This refers to the portion of the well across the production or injection zone. The well designer has many tools and options available to design the lower completion according to the conditions of the reservoir. Typically, the lower completion is set across the productive zone using a liner hanger system, which anchors the lower completion to the production casing string. The broad categories of lower completion are listed below.

Barefoot completion

This type is the most basic, but can be a good choice for hard rock, multi-laterals and underbalance drilling. It involves leaving the productive reservoir section without any tubulars. This effectively removes control of flow of fluids from the formation; it is not suitable for weaker formations which might require sand control, nor for formations requiring selective isolation of oil, gas and water intervals. However, advances in interventions such as coiled tubing and tractors means that barefoot wells can be successfully production logged, zonal isolation of the toe-end can be achieved (e.g. cemented off), and sidetracks can readily be drilled from within the barefoot section.

 

 

Заказать

Upp